Stormwater Small Sewer Separation

Stormwater Small Sewer Separation

Background: As CRW’s City Beautiful H2O Program outlines, significant CSO reduction is required within the Paxton Creek Interceptor sewersheds. Small sewer separation is a cost-effective…

PENNVEST Pro-Fi Phase 5

PENNVEST Pro-Fi Phase 5

Background: CRW is employing decentralized green/grey stormwater control infrastructure to manage stormwater runoff and prevent flows from entering the combined sewer system, thereby reducing combined…

PENNVEST Pro-Fi Phase 4

PENNVEST Pro-Fi Phase 4

Background: CRW is employing decentralized green/grey stormwater control infrastructure to manage stormwater runoff and prevent flows from entering the combined sewer system, thereby reducing combined…

MS4 Paxton Creek TMDL

MS4 Paxton Creek TMDL

Background: CRW owns the City of Harrisburg Municipal Separate Storm Sewer System (MS4) and applied for an individual NPDES Permit to operate the system in…

Lower Paxton Creek-Stormwater Injection Well

Lower Paxton Creek-Stormwater Injection Well

Background: The Stormwater Injection Well Study is focused on the wet weather control within the Lower Paxton Creek Priority Planning Area identified in the alternative…

Signup for our newsletter

"*" indicates required fields

Enter your email address to subscribe
This field is for validation purposes and should be left unchanged.