Elliot Street Water Main Replacement

Elliot Street Water Main Replacement

Background: CRW’s finished water distribution system delivers drinking water and fire flows throughout the City of Harrisburg and portions of Susquehanna Township and Penbrook. Much…

Advanced Metering Infrastructure (AMI) Upgrade

Advanced Metering Infrastructure (AMI) Upgrade

Background: CRW currently gathers water usage readings from meters through a radio-read system. A transceiver (MXU) unit with each meter allows CRW employees to drive…

DeHart Primary Transmission Main Mountain Line Repairs

DeHart Primary Transmission Main Mountain Line Repairs

Background: CRW’s primary supply raw water transmission main is a 42‑inch reinforced concrete cylinder pipe constructed in the late 1930s. The original isolation and air…

Drinking Water Distribution System Water Main Improvements

Drinking Water Distribution System Water Main Improvements

Background: CRW’s finished water distribution system delivers drinking water and fire flows throughout the City of Harrisburg and portions of Susquehanna Township, Paxtang, and Penbrook.…

DeHart Dam Improvements Project

DeHart Dam Improvements Project

Background: CRW’s primary raw water supply is the DeHart Reservoir, impounded by DeHart Dam. The dam was constructed in the early 1940s with an emergency…

Signup for our newsletter

"*" indicates required fields

Enter your email address to subscribe
This field is for validation purposes and should be left unchanged.