DeHart Primary Transmission Main Mountain Line Repairs
Background:
CRW’s primary supply raw water transmission main is a 42‑inch reinforced concrete cylinder pipe constructed in the late 1930s. The original isolation and air release valves on the main require maintenance and repair.
Project Purpose:
Replace broken isolation valves on the raw water transmission main to ensure operational reliability.
Project Summary:
Replace a leaking 42‑inch isolation valve in Middle Paxton Township. The project will be financed from 2018 series bonds/cash.