Capture and manage stormwater in green stormwater elements designed to also serve as traffic calming elements.

Location

Walnut & Chestnut

Schedule

2021 Design; 2022 Construction

Status/Phase

Design

Background:

The City has been awarded a Pennsylvania Department of Community and Economic Development Multimodal Transportation Funding (MTF) grant for pedestrian, bike, and roadway improvements to Chestnut Street and Walnut Street. Improvements will be made to Chestnut Street between 3rd Street and 4th Street and to Walnut Street between Front Street and 4th Street. CRW will evaluate and design green stormwater infrastructure and integrate into the multimodal design.

Project Purpose:

Capture and manage stormwater in green stormwater elements designed to also serve as traffic calming elements.

Project Summary:

Construct green stormwater elements (curb bump-out rain gardens, subsurface infiltration trenches, and tree trenches). GSI identified as part of this project may be integrated into the PENNVEST Prog Phase 4 Design/Construction package.

The project will be financed by a PENNVEST low-interest loan.